Khulna University of Engineering & Technology
Central Library

Normal view MARC view ISBD view

Integrated cost and schedule control for construction projects / Frederick Wm. Mueller.

By: Mueller, Frederick William.
Material type: materialTypeLabelBookPublisher: New York : Van Nostrand Reinhold Co., c1986Description: xviii, 504 p. : ill. ; 24 cm.ISBN: 0442261691.Subject(s): Building -- Estimates | Construction industry -- Management | Production schedulingDDC classification: 692.5
Tags from this library: No tags from this library for this title. Log in to add tags.
Item type Current location Call number Copy number Status Date due Barcode Item holds
Books Books Central Library, KUET
General Stacks
692.5 MUE (Browse shelf) 1 Available 3010013136
Total holds: 0

Includes index.

There are no comments for this item.

Log in to your account to post a comment.


Khulna University of Engineering & Technology
Funded by: HEQEP, UGC, Bangladesh